The Bookshop will be closed on Fri 22nd Nov. All orders placed after 4pm on Thu 21st will be processed on Mon 25th.

JCT Standard Building Subcontract with Subcontractor's Design Conditions 2024

JCT Standard Building Subcontract with Subcontractor's Design Conditions 2024

Vendor
JCT
Regular price
£98.40
Sale price
£98.40
Regular price
Sold out
Unit price
per 
Tax included. Shipping calculated at checkout.

THIS CONTRACT IS FOR USE BASED ON ENGLISH LAW, FOR SCOTLAND SEE SBCC CONTRACTS.

 

    JCT Standard Building Subcontract with Subcontractor's Design Conditions 2024

     

    • The Standard Building Sub-Contract with sub-contractor’s design is made up of two parts: the Sub-Contract Agreement (SBCSub/D/A) which includes the Recitals, Articles and Sub-Contract Particulars, and the Sub-Contract Conditions (SBCSub/D/C).
    • It is for use when the main contract is one of the Standard Building Contracts (SBC/Q, SBC/XQ, or SBC/AQ), where the main contractor is to design specific parts of the works (Contractor’s Designed Portion), and where the sub-contractor is to design part or all of the sub-contract works.
    • It can be used when either the main contract works or the sub-contract works are to be carried out in sections.
    • It can be be used for sub-contract works that are to be carried out on the basis of an adjusted sub-contract sum (adjustment for variations etc.) or by complete remeasurement.
    • Provisions are included for collaborative working, sustainability and bonds (off-site materials and retention).

     

    Appropriate:

    • For use where the main contract is the Standard Building Contract (with quantities, without quantities or with approximate quantities)
    • Where the Contractor is to design discrete part(s) of the main contract works (Contractor's Designed Portion)
    • The Sub-Contractor is to design any part of the sub-contract works (Sub-Contractor's Designed Portion)

    Can be used:

    • Where the sub-contract works and/or main contract works are to be carried out in sections
    • For sub-contract works that are to be carried out on the basis of an adjusted sub-contract sum (adjustment for variations etc.) or by complete remeasurement

    Not suitable:

    • Where no subcontractor's design is involved - consider the Standard Building Sub-Contract (SBCSub/A and SBCSub/C).

         

         

        Publisher: Sweet & Maxwell Ltd

        Format: Paperback

        ISBN: 9780414108295

        Short Code: JCT SBCSub/D/C/2024

        Publication Date: August 2024